get Bazel Critical Path
@GET(value = "api/builds/{id}/bazel-critical-path" )
GET api/builds/{id}/bazel-critical-path Get the critical path of a Bazel build. This model is Bazel specific and cannot be requested for another build tool. Responses:
200: The critical path of a Bazel build.
400: The request cannot be fulfilled due to a problem.
404: The referenced resource either does not exist or the permissions to know about it are missing.
500: The server encountered an unexpected error.
503: The server is not ready to handle the request.
Return
Parameters
id
The Build Scan ID.
availability Wait Timeout Secs
The time in seconds the server should wait for ingestion before returning a wait timeout response. (optional)